Contents
Executive
Summary
1.1 Purpose of the Report
1.2 Structure of the Report
2.1 Background
2.2 General Site Description
2.3 Construction Activities
2.4 Project Organisation and Management Structure
2.5 Status of Environmental Approval Documents
3 Environmental
Monitoring Requirement, environmental Mitigation Measures
4 Implementation Status on Environmental Protection
Requirements
6.1 Weekly Site Audits
6.2 Landscape and Visual Audit
7 Environmental Non-conformance
7.1 Summary of Environmental Non-Compliance
7.2 Summary of Environmental Complaint
7.3 Summary of Environmental Summon and Successful
Prosecution
8.1 Key Issues for the Coming Month
8.2 Construction Programme
LIST
OF TABLES
Table 2.1 Summary
of Construction Activities Undertaken in the Reporting Period
Table 2.2 Summary
of Environmental Licensing, Notification and Permit Status
Table 5.1 Quantities
of Waste Generated from the Project
Table 8.1 Construction
Works to be undertaken in the Next Reporting Period
LIST OF ANNEXES
Annex A |
|
Annex B |
|
Annex C |
|
Annex D |
|
Annex E |
|
Annex F |
|
Annex G |
Environmental complaint,
Environmental Summons and Prosecution Log |
ERM-Hong
Kong, Limited (ERM) was appointed by OSCAR Bioenergy Joint Venture (the Contractor)
as the Environmental Team (ET) to undertake the Environmental Monitoring and
Audit (EM&A) programme for the Contract No. EP/SP/61/10
of Organic Waste Treatment Facilities Phase I (the
Project).
This
is the 3rd EM&A report which summarises the monitoring results
and audit findings for the EM&A programme during the reporting period from 1
to 31 August 2015.
The
structure of the report is as follows:
Section
1: Introduction
It
details the scope and structure of the report.
Section
2: Project Information
It
summarises the background and scope of the Project, site description, project
organization, construction programme, construction works undertaken and status of
the Environmental Permits (EP)/licences over the construction phase of the
Project.
Section
3: Environmental
Monitoring Requirements
It
summarises the environmental monitoring requirements including monitoring
parameters, programmes, methodologies, frequency, locations, Action and Limit
Levels, Event/Action Plans, environmental mitigation measures as recommended in
the EM&A Manual and approved EIA report.
Section 4: Implementation
Status on Environmental Mitigation Measures
It
summarises the implementation of environmental protection measures during the
reporting period.
Section 5: Waste
Management
It
summarises the quantity of public fill and construction waste generated in the
reporting period
Section 6: Environmental
Site Inspection
It
summarises the audit findings of the weekly site inspections undertaken within
the reporting period.
Section 7: Environmental
Non-conformance
It
summarises any exceedance of environmental performance standard, environmental
complaints and summons received within the reporting period.
Section
8: Further
Key Issues
It
summarises the impact forecast and monitoring schedule for the next reporting
month.
Section
9: Conclusions
The Organic Waste Treatment
Facilities (OWTF) Phase I development (hereinafter referred to as “the
Project”) is to design, construct and operate a biological treatment facility
with a capacity of about 200 tonnes per day and convert source-separated
organic waste from commercial and industrial sectors (mostly food waste) into
compost and biogas through proven biological treatment technologies.
The
environmental acceptability of the construction and operation of the Project
had been confirmed by findings of the associated Environmental Impact
Assessment (EIA) Study completed in 2009.
The Director of Environmental Protection approved this EIA Report under
the Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) in February
2010 (Register No.: AEIAR-149/2010) (hereafter referred to as the approved EIA Report). Subsequent Report on Re-assessment on
Environmental Implications and Report on Re-assessment on Hazard to Life
Implications were completed in 2013, respectively.
An Environmental Permit (EP) (No. EP-395/2010)
was issued by the Environmental Protection Department (EPD) to the EPD, the
Permit Holder, on 21 June 2010 and varied on 18 March 2013 (No. EP-395/2010/A)
and 21 May 2013 (No. EP-395/2010/B), respectively. The Design Build and Operate Contract for the
OWTF (Contract No. EP/SP/61/10 Organic Waste Treatment Facilities Phase I (the
Contract)) was awarded to SITA Waste Services Limited, ATAL Engineering Limited
and Ros-Roca, Sociedad Anonima jointly trading as the OSCAR Bioenergy Joint
Venture (OSCAR or the Contractor). A Further EP (No. FEP-01/395/2010/B) was
issued by the EPD to the OSCAR on 16 February 2015.
Under the requirements of Condition 5 of the EP (No.
FEP-01/395/2010/B), an Environmental Monitoring and Audit (EM&A) programme
as set out in the Agreement No. CE7/2008 (EP) EM&A Manual (hereinafter
referred to as EM&A Manual) is required to be implemented. ERM-Hong Kong, Ltd (ERM) has been appointed
by OSCAR as the Environmental Team (ET) to undertake the EM&A programme for the Contract.
The construction works commenced on 21 May 2015 and
are scheduled for completion by April 2017.
The
Project Site is located at Siu Ho Wan in North Lantau with an area of about 2
hectares. The layout of
the Project Site is illustrated in Annex A.
A
summary of the major construction activities undertaken in the reporting period
is shown in Table 2.1. The locations of the construction activities
are shown in Annex B. The construction programme of the Project is
presented in Annex C.
Table
2.1 Summary of Construction Activities
Undertaken in the Reporting Period
Construction Activities Undertaken |
·
Piling; ·
Excavation Works
for Building 1 and Building 2; ·
Earthing Copper Tape
Installation; and ·
Tower Crane
Erection |
The project organisation chart and contact details are
shown in Annex D.
A summary
of the valid permits, licences, and/or notifications on environmental
protection for this Project is presented in Table 2.2.
Table 2.2 Summary
of Environmental Licensing, Notification and Permit Status
Permit/ Licences/ Notification |
Reference |
Validity Period |
Remarks |
Environmental Permit |
FEP-01/395/2010/B |
Throughout the Contract |
Permit granted on 16 February 2015 |
Notification of Construction Works under the Air
Pollution Control (Construction Dust) Regulation |
Ref No. 386715 |
Throughout the Contract |
- |
Effluent Discharge License |
WT00021482-2015 |
21 May 2015 – 31 May 2020 |
Approved on 21 May 2015 |
Construction Noise Permit |
GW-RW0396-15 |
1 April 2015 – 14 January 2016 |
- |
Chemical Waste Producer Registration |
WPN 5213-961-O2231-01 |
Throughout the Contract |
Approved on 29 April 2015 |
Waste Disposal Billing Account |
Account number: 702310 |
Throughout the Contract |
- |
All the
relevant environmental mitigation measures listed in the EIA Report and
EM&A Manual are summarised in Annex E.
According
to the EM&A Manual and EP requirement, no air quality, noise and water
quality monitoring is required.
Bi-weekly
landscape and visual audit is required to ensure that the design, implementation
and maintenance of landscape and visual mitigation measures recommended in the
EIA Report are fully achieved.
The
Contractor has implemented environmental mitigation measures and requirements
as stated in the approved EIA Report and EM&A Manual. The implementation status of the measures
during the reporting period is summarised in Annex E.
Wastes
generated from this Project include inert construction and demolition (C&D)
materials (public fill) and non-inert C&D materials (construction
waste). Construction waste comprises
general refuse, metals and paper/cardboard packaging materials. Metals generated from the Project are also
grouped into construction waste as the materials were not disposed of with
others at public fill. Reference has
been made to the Monthly Summary Waste Flow Table prepared by the Contractor
(see Annex
F). With reference to the
relevant handling records and trip tickets of this Project, the quantities of
different types of waste generated in the reporting month are summarised in Table 5.1.
Table
5.1 Quantities of Waste Generated from the
Project
Month / Year |
Quantity |
|||
|
Total Inert C&D Materials Generated (a) |
Non-inert C&D Materials (b) |
||
C&D Materials Recycled © |
C&D Waste Disposed of at Landfill (d) |
Chemical Waste |
||
August 2015 |
6,657.25 tonnes |
0.00 kg |
55.06 tonnes |
0 L |
Notes: (a)
Inert C&D materials (public fill) include
bricks, concrete, building debris, rubble and excavated spoil. In total, 6,657.25 tonnes
of inert C&D material were generated from the Project, of which 0.00
tonnes were reused in this Contract and the remaining 6,657.25 tonnes were disposed as public fill to Fill
Banks at Tuen Mun Area 38
and Tseung Kwan O Area 137. The detailed waste flow
is presented in Annex F. (b)
Non-inert C&D materials (construction wastes)
include metals, paper / cardboard packaging waste, plastics and other wastes
such as general refuse. Metals
generated from the Project were grouped into construction wastes as the
materials were not disposed of with others at the public fill. (c)
0.00 kg of metals, 0.00
kg of papers/ cardboard packing and 0.00 kg of plastics were sent to
recyclers for recycling during the reporting period. (d)
Construction wastes other
than metals, paper/cardboard packaging, plastics and chemicals were disposed
of at NENT Landfill by subcontractors.
|
Joint site
inspections were conducted by representatives of the Contractor, the ER, IC and
the ET on 7, 14, 19 and 28 August 2015. The IEC was also present at the joint inspection on 19 August 2015. Follow-up actions resulting
from the last site inspections were taken as reported by the Contractor and
their results were observed in the site inspections conducted in the reporting
period.
Major observations during the reporting period are
summarised as follows:
7 August 2015
· Exposed area for vehicle route was found to be dry and dusty. It was recommended to spray water regularly
to prevent dry and dusty situation.
· Environmental Permit displayed at the entrance was found to be
folded. It was recommended to provide an
Environmental Permit at a convenient location for public’s information at any
times.
14 August 2015
· Rock breaking activity was found to be dry and dusty. It was recommended to spray water to prevent fugitive dust emission
especially during dry weather.
· Chemical containers were found to be placed on top of plant equipment
without drip tray. It was recommended to
place them on ground level and to provide drip tray to them.
19 August 2015
· Exposed work area in Building 2 area was found to be dry and dusty. It was recommended to spray water to prevent fugitive dust emission
especially during dry weather.
· Soil was found to be not completely
covered by tarpaulin sheet. It was
recommended to fully cover it to prevent fugitive dust emission especially
during dry weather.
28 August 2015
· Different types of chemical
containers were found to be placed without drip trays. It was recommended to provide drip tray for
chemical containers, and to place the same type of chemical in the same area.
In accordance with the EM&A Manual, bi-weekly
landscape and visual inspection is required to ensure
that the design, implementation and maintenance of landscape and visual
mitigation measures recommended in the EIA Report are fully achieved. An onsite inspection of the landscape and
visual mitigation measures was performed on 14 and 28 August 2015.
Follow-up actions resulting
from the last site inspections were taken as reported by the Contractor and
their results were observed in the site inspections conducted in the reporting
period.
It was confirmed that most
of the necessary
landscape and visual mitigation measures as summarised in Annex E were implemented by the
Contractor.
The major findings are summarised as follows:
Item |
Observation & Recommendation |
Photo Record |
14
August 2015 |
||
1. |
Tree T43 was found to be in poor health condition. It was recommended to spray water to it
regularly and seek advice from the landscape architect to check the condition
of tree. |
(T43) |
28
August 2015 |
||
1. |
No observation was recorded. |
|
No
non-compliance event was recorded during the reporting period.
Works
to be undertaken for the coming monitoring period are summarised in Table 8.1.
Table
8.1 Construction Works to be undertaken in
the Next Reporting Period
Construction Activities Undertaken |
|
·
Excavation Works
for Building 1 and Building 2 ·
Construction Works
for Building 2 ·
AD Tank Foundation |
Potential
environmental impacts arising from the above construction activities will be
mainly associated with dust, construction noise, site runoffs, waste management
and landscaping issues.
The
most up-to-date construction programme for the Project is presented in Annex C.
This
EM&A Report presents the EM&A programme undertaken during the reporting
period from 1 August 2015 to 31 August 2015 in accordance with EM&A Manual
and requirements of EP (FEP-01/395/2010/B).
No air
quality, noise and water quality monitoring is required.
Bi-weekly landscape and visual monitoring was
conducted in the reporting period. Most
of the necessary landscape and visual mitigation measures recommended in the
EIA Report were implemented by the Contractor.
Follow-up actions are required by the Contractor to improve protection
of the retained or to-be transplanted trees.
No non-compliance event was recorded during the
reporting period.
No
complaint and summons/prosecution was received during the reporting period.
The
ET will keep track of the EM&A programme to ensure compliance of
environmental requirements and the proper implementation of all the necessary
mitigation measures in the coming periods.
EXECUTIVE
SUMMARY
The construction works of No. EP/SP/61/10 Organic Waste
Treatment Facilities Phase I (the Project) commenced on
21 May 2015. This is the 3rd monthly Environmental Monitoring and
Audit (EM&A) report presenting the EM&A works carried out during the
period from 1 August 2015 to 31August 2015 in accordance with the EM&A
Manual.
Summary
of Construction Works undertaken during the Reporting Month
Works
undertaken in the reporting month included:
·
Piling;
·
Excavation Works for Building 1 and Building 2;
·
Earthing
Copper Tape Installation; and
·
Tower Crane Erection.
Environmental
Monitoring and Audit Progress
A
summary of the monitoring activities undertaken in this reporting period is
listed below:
·
Joint Environmental Site Inspection |
4 times |
·
Landscape & Visual Monitoring |
2 times |
Waste Management
Waste generated from this Project includes inert
construction and demolition (C&D) materials (public fill) and non-inert
C&D materials (construction wastes).
Inert C&D materials (public fill) include bricks,
concrete, building debris, rubble and excavated spoil. In total, 6,657.25 tonnes of inert C&D
material were generated from the Project, of which 0.00 tonnes were reused in
this Contract and the remaining 6,657.25 tonnes were disposed as public fill to
Fill Banks at Tuen Mun Area
38 and Tseung Kwan O Area 137.
Non-inert C&D materials (construction wastes)
include metals, paper / cardboard packaging waste, plastics and other wastes
such as general refuse. 0.00 kg of metals, papers/ cardboard packing and plastics were
sent to recyclers for recycling during the reporting period. 55.06 tonnes of
general refuse was disposed as landfill.
Environmental Site Inspection
Five weekly joint environmental site inspections were carried
out by the representatives of the Contractor, SOR and the Environmental Team
(ET). The IEC was also present at the joint inspection on 19 August 2015. Details of the
audit findings and implementation status of the mitigation measures are
presented in Section 6.1.
Landscape
& Visual
An onsite inspection on
landscape and visual mitigation measures was performed on 14 and 28 August 2015. Details of the audit findings and
implementation status of the mitigation measures are presented in Sections
6.2.
Environmental
Exceedance/Non-conformance/Compliant/Summons and Prosecution
No exceedance was recorded during the reporting
period.
No non-compliance event was recorded during the
reporting period.
No
environmental complaint and summon/prosecution was received in this reporting
period.
Future
Key Issues
Works
to be undertaken in the next reporting month include:
·
Excavation Works for Building 1 and Building 2;
·
Construction Works for Building 2; and
·
AD Tank Foundation
Environmental
impacts arising from the above construction activities are mainly associated
with dust, construction noise, site runoffs, waste management and landscaping
issues.